LTE
RAN - RELEASE SPECIFIC
›Some interesting
documents:
–LTE Lxx Features: provides high-level overview of new or
enhanced features in the release
–LTE Lxx Commercial Presentation: similar to above but for pre-GA release
LTE
RAN – RELEASE SPECIFIC
›More interesting
documents:
–LTE Lxx New and Enhanced
Features: high-level technical
description of new or enhanced features
–
–Feature Restrictions for LTE
RAN
–
–Statements of compliance
towards 3GPP specifications (http://www.3gpp.org)
AgenDA
›Ericsson LTE Product
Catalog
–Product Catalog Basics
–LTE RAN Space
–RBS 6000 Space
–Key LTE Product Catalog
Documents
›Ericsson LTE CPI Basics
–Overview
–LTE CPI Library Structure
–Key LTE CPI Documents
RBS
6000 General
›Main points-of-interest
on generic Base Stations page:
–RBS Roadmap (including RBS 6000
family)
RBS
6000 GENERAL
›Similar to LTE RAN
structure, except one folder per RBS model instead of one folder per LTE
release
RBS
6000 General
›Antenna Integrated Radio
(AIR) documents:
–AIR presentation: product overview with a marketing twist
RBS
6000 GENERAL
›RBS 6000 documents:
–RBS 6000 LTE Baseband Product
Description: description of digital unit
(DUL/DUS) & configurations
–
–RBS 6000 Description: product description covering entire RBS 6000
family, including AIR
AgenDA
›Ericsson LTE Product
Catalog
–Product Catalog Basics
–LTE RAN Space
–RBS 6000 Space
–Key LTE
Product Catalog Documents
›Ericsson LTE CPI Basics
–Overview
–LTE CPI Library Structure
–Key LTE CPI Documents
LTE
RAN Roadmap
›Formally updated
quarterly
–Interim updates communicated
via product bulletins
–Two versions available: presentation & description
›Roadmap scope:
–Overview per release: RFA/GA
dates, 3GPP support, main features
–Detailed roadmap per feature
category
›Radio & Performance,
Services, Transport, and OAM & SON
›Heterogeneous Networks, VoLTE (Voice over LTE) related
features
›RBS 6401 (pico RBS) specifics
–Differences between roadmap for
TDD vs. FDD
–Frequency Availability in
Hardware: overview only, details in RBS roadmap
›The
development status of the product area releases are color-coded
›The
following definitions of release dates are used:
–RFA (Ready for Acceptance): At RFA
the release is handed over to FOA (First Office Application) customers for them
to start acceptance
–GA (General Availability): From GA, the release is handled through the
regular ordering and commissioning flow.
No comments:
Post a Comment