Search Telecom Hub in Google to find us any were

Wednesday, 17 June 2015

LTE CPI STRUCTURE
›Most important folders:
–Product Overview
›System and Node Description
›Feature Descriptions
›Feature Overview
›HW Descriptions (e.g. AIR)
›
–Planning
›Network Impact Report
›Parameter and Counter Limitations
›Delta Lists
-Alarms, events, counters, parameters
›Dimensioning
›
–Initial Configuration
›Radio Network Configuration
›Transport Network Configuration
›
–Operation and Maintenance
LTE O&M CPI
KEY LTE CPI DOCUMENTS
›Some key CPI documents to get started with Ericsson LTE RAN:
–System and Node Description
›Overview of LTE RAN system & RBS node, including high-level description of system architecture, interfaces, hardware & key functions
›
–Network Impact Report
›Describes how new or changed features for a specific release can impact existing customer network upon introduction, including capacity, performance, hardware, interfaces, network elements & observability
›
–Key Performance Indicators
›Describes LTE RAN KPIs used to measure subscriber perceived quality and system performance
›
–Parameter and Counter Limitations
›Lists unsupported parameters/ranges, counters, events and alarms
›
–Flowcharts for Counters
›Flowcharts for main traffic scenarios & relevant counters, indicating how & when these counters are pegged
›
–Managed Object Model (MOM)
›A view of all the manageable resources in the node, and all the associated parameters, counters and actions
›
–Feature Descriptions
›Describes feature operation, including main benefits & impacts in LTE RAN
System & Node Description
›Some important chapters:
–Hardware:  Includes high-level description of digital unit & radio unit functions
–
–Traffic interfaces:  Includes protocol stacks for control plane & user plane, high-level description of air interface protocols
–
–Bearers & Services, etc:  Include high-level definitions/terminology for different LTE bearers
–
–Scheduler:  Overview of scheduler inputs/resources & associated features
–
–QoS:  High-level overview of QoS & associated features
FLOWCHARTS for COUNTERS 
›Description document contains flowcharts for the main traffic sequences that impact performance statistics counters in the RBS
–Only a subset of available counters is included in the document
–
›Flowcharts are drawn from RBS perspective & are meant to give some insight into the implementation of the counter
–E.g. when it is stepped, related counters, etc.



No comments:

Post a Comment